Research Paper Doctorate 312 words

Report of San Antonio Tunnel

Last reviewed: November 30, 2004 ~2 min read

San Antonio River Tunnel is part of the San Antonio Channel Improvement flood protection project. The purpose of this tunnel is to provide protection from a 100-year flood event and provide rain runoff underneath the city leading to the San Antonio River. The project was initiated in 1987 and construction for the tunnel started in September 1993. This project was a coordinated effort between the United States Army Corps of Engineers and the San Antonio River Authority. The Corps bid on the project on behalf of the River Authority at an overall cost of 111 million dollars The tunnel became operational in August 1996 and was completed in 1999. The tunnel is 140 feet below the ground surface, 24 feet in diameter, and 3.1 miles long.

The future productivity of the San Antonio River Tunnel is great. Urban development in the watersheds above Olmos Dam has led to larger, more frequent floods in the San Antonio area. A recent example illustrates the tunnel's practical usefulness. San Antonio endured tremendous rains and flooding in 1998. The tunnel diverted much of the rain runoff, thus preventing the downtown district from being submerged in an estimated 6 feet of water. Thus, it has been proposed that the tunnel has already paid for itself regarding the damage prevention from this episode.

You’re 66% through this paper. Sign up to read the full paper.

Sign Up Now — Instant Access Already a member? Log in
130,000+ paper examples AI writing assistant Citation generator Cancel anytime
Cite This Paper
PaperDue. (2004). Report of San Antonio Tunnel. PaperDue. https://paperdue.com/essay/report-of-san-antonio-tunnel-59014

Always verify citation format against your institution’s current style guide requirements.