Paper Example Undergraduate 581 words

Locker project design and implementation

Last reviewed: March 15, 2014 ~3 min read

Locker Construction

Statement of situation: To manufacture 60 lockers with the IPA to help facilitate ease of use and access for workers and business patrons.

The use of Good Housekeeping and Organization to help smooth the progress of the overall installation of the lockers within the IPA. In addition, the GHO guidelines will help ensure a smooth installation process to better reduce unexpected building costs.

Financial Benefit: Less employee to employee theft within the IPA. With lockers, employees and patrons now have a safe and secure location to place belongings or items. In addition, the lockers can help reduce storage costs associated with bulk items in use within the IPA. Lockers can ultimately increase worker productivity as equipment is stored in a single, secure location. Workers who otherwise are forced to store items in sporadic areas throughout the IPA now have a convenient point of access for important work materials. This will help reduce unproductive time associated with the travel needed to retrieve items.

Another financial benefit of the lockers include lower energy, waste disposal, and water costs, lower environmental and emissions costs, lower operations and maintenance costs, and savings from increased productivity and health. Energy and water savings can be predicted with reasonable precision, measured, and monitored over time. In contrast, productivity and health gains are much less precisely understood and far harder to predict with accuracy.

To appropriate ascertain the exact amount of price savings from less energy usage, assumptions must be made. Calculating the current financial value of lower future energy consumption requires estimating future energy costs. This is complicated by the changing tariff structures of utilities. For example, electricity rates have climbed steeply over the past several years, in large part due to surcharges mandated by the CPUC . As indicated in Figure IV-1, peak electricity prices are as high as $0.23 per kWh for buildings (including most state buildings) that are on time-of-use rates. At this time, it is not clear what future electricity prices will be. However, as the lockers are being constructed, less energy will be needed in regards to heating or cooling of the room. The room will not need to utilized computers, refrigerators, or other appliances that use energy. As such, savings can be realized overtime, through reduced usage of energy.

A-1 TOU

Single Phase Service per meter/day =$0.32854 Polyphase Service per meter/day =$0.65708

Summer

On peak

$0.23743

Part Peak

$0.22915

Off Peak

$0.20395

Winter

Part Peak

$0.16095

Off Peak

$0.14289

Source:

http://www.pge.com/tariffs/CommercialCurrent.xls

Utility transmission and distribution (T&D) systems generally run at less than 50% capacity.113 However, during periods of peak electricity use, the generation and T&D systems may be close to overloaded. The benefits of reduced consumption are largest during periods of peak power consumption -- avoided congestion costs, reduced power quality and reliability problems, reduced pollution

You’re 81% through this paper. Sign up to read the full paper.

Sign Up Now — Instant Access Already a member? Log in
130,000+ paper examples AI writing assistant Citation generator Cancel anytime
References
2 sources cited in this paper
  • 1) Davies, Nikolas, and Erkki Jokiniemi. "Construction" def. 1-55. Dictionary of architecture and building construction. Amsterdam: Elsevier/Architectural Press, 2008, page34-. 93.
  • 2) Sturgis, Russell. "Construction def. B. and "Building" def. A. Sturgis' illustrated dictionary of architecture and building: an unabridged reprint of the 1901-2 edition. Mineola, N.Y.: Dover, 1989.
Cite This Paper
PaperDue. (2014). Locker project design and implementation. PaperDue. https://paperdue.com/essay/ipa-locker-construction-185093

Always verify citation format against your institution’s current style guide requirements.