Verified Document

Waste Sustainability In Coed Darcy Research Paper

8 services are given:

• 3 internal storage bins for recyclable waste with -- min total capacity of 60 ltr

-- no individual bin smaller than 15 ltr

-- all of the bins in a devoted position that is accessible to disabled people

1.8

or

or

Where full recycling facilities

3.6

are provided:

• 3 internal storage bins with -- min total capacity of 30 ltr

-- no individual bin smaller

than 7 ltr

-- all bins in a dedicated position that is accessible to disabled people

or 3.6

AND EITHER

• a Local Authority collection scheme for recyclable materials covering at least three streams of waste with sufficient space for the storage of the bins provided without stacking (within 10m of an external door) and which is accessible to disabled people

Construction Waste

Where the site waste management

0.9

plan includes procedures and commitments that minimise waste generated on site in accordance

with WRAP/Envirowise guidance

1.8

Composing Facilities

or

Where the above is achieved and the plan includes procedures and commitments to sort, reuse and recycle construction waste either on site or through a licensed external contractor

1.8

Where home composting facilities

Facilities are provided in houses with gardens or a communal/community composting service provided in other dwelling types suitable for normal domestic non-woody garden, food and other compostable household wastes.

Account should be taken concerning

the accessibility of these facilities to disabled people

0.9

Material and Methods to sustain waste

Waste Management Hierarchy

It is that Coed Darcy in Wales will adapted to a waste hierarchy that includes waste reduction, recycle, energy recovery, material recycling, material recovery, and final removal (landfill disposal). The chief goal of the hierarchy is decreasing waste disposal at landfills in order to stay sustained. The waste management hierarchy, which is shown in Figure 2.2, demonstrates the numerous waste management substitutes that are also obtainable for practice in the construction industry in Coed Darcy.

Figure 5 Waste Management Hierarchy

As mentioned in earlier sections, the construction industry in Coed Darcy is a major waste producer that is responsible for a high percentage of landfill disposals; for that reason, a waste management hierarchy, which would be great for planning, is significant. As offered in the hierarchy, it is supposed that the most environmentally friendly other is first (at the top), even though the most unwanted choice is last (at the bottom). Nonetheless, depending on the material measured and numerous geographical limits, for instance position of the construction site, the space to the adjacent recycling facility, etc., the most sustainable other has to be examined a case-by-case foundation.

Minimization of Waste (Reduce)

Avoidance is the perfect outcome for any material waste; nevertheless, this may not be probable or applied in most cases. Reduction of the source is the next best alternative in adaptable the cohort of waste in the first place. Source reduction is described as "the design, manufacture, buying, or use of materials to decrease their quantity or toxicity before they are able to reach the waste stream," as said by the U.S. Environmental Protection Agency (EPA). It contains the decrease of waste generation at the beginning of the product in addition to throughout the product practice.

Reuse

The objects that are discarded in Coed Carcy as waste materials can occasionally be utilized once more for the same envisioned determination or for a dissimilar purpose: this is denoted to as the recycle of waste resources. It may be essential to have a sure quantity of prior actions that are involved with material reuse; on the other hand, reuse is favored to recycling, as it does not need as much energy ingesting.

Cost-Benefit Analysis of Recycling Bins

Costs of recycling bin are estimated from the costs of collection and sorting, less the value of material in end-use markets.

The results are put together in the table below. It shows the percentage of materials that are assumed to be theoretically recoverable using current technologies, the percentage currently improved and percentages that could be recycled for each material with positive net benefits under low and high benefit expectations. It displays the outcomes utilizing two discount rates: 5% and 10%.

Table 1 Waste collection assumptions for bins.

Bags/bins

Box/bin ($/item)

0.12

35

Lifetime (years)

0

7

kg/household/week

7.5

6.8

$/t

16

18

Table 2 Summary cost of waste collection for bins.

$/truck pa

$/t

$/truck pa

$/t

Bin

52,800

16.0

31,285

9.5

Table 3 Cost of Bins Per household

Costs

$/household

$/tonne

Bins (per household) Collection

60-70

19-23

80 -- 120

Processing Transport Total

10 -- 15

229-278

Bioremediation/Solidifcation Soil Treatment

The source of the contaminated soil which accepted at the facility for treatment is naturally subsurface and surface releases of hydrocarbons from leaking storage and spills tanks using prefabricated construction material and modular construction. The Permittee obtains, stores, and treats the soils in a double-lined cell with leak discovery to guarantee repression of all dirtied material. The LRL-BF double-lined Cell 1(Outfall 002) was built with a 4-foot thick clay primary lining and a composite secondary liner made up of a 60-mil HDPE and 13-inch thick compressed low penetrability soil layer having a leak...

The soils and any of the convalesced leachate or leakage are treated to lessen the lasting meditations of petroleum hydrocarbons to stages that permit the soil, leachate, and leakage to be used as landfill cover material, mixed with solid waste, dust suppression, and/or soil conditioning in achieved MSW areas that are in accordance with this permit and the BWM permit criteria required for such use along with the utilization of prefabricated construction material and modular construction. The leachate by-product from the Bioremediation cell, for the purposes of this permit, is not considered a petroleum or petroleum-based product. Leachate from the Permittee achieved bioremediation cell will be achieved in agreement with permit limitations set for non-hazardous liquids having incidental TPH concentrations that are present.
Table 4 This charts shoes the Bioremediation.

Paremeter

Discharge Limitations

Monitoring Requirements

Bioremediation Cell 1

M&R

Daily

ACCEPT SOIL2 for Bioremediation

Month Total (yd3)

M&R

Each 500 yd3 or less

NEW Water from sources other than recirculated Bioremediation Liquids [precipitation per I.A.14] Month Total (gallons)

M&R

Each 500 yd3 or less

NEW Water from sources other than recirculated Bioremediation Liquids [precipitation per I.A.14] Month Total (gallons)

11,000

Each load

Treat and/or Store Soil (yd3

Each load

REMOVE

3

SOIL for Application

(yd3)

Monthly

Conclusion

The present construction waste management practices in Coed Darcy and the development of essential tools to conduct on-site waste management more efficiently and competently, in order to attain sustainable development objectives. Expansion of a theoretical framework for on-site waste management modelling, growth of a strategic planning framework for waste management in Coed Darcy, and also making sure that the Code for Sustainable Homes are being established in order to allow a step change in sustainable building practice that would be for the new homes. It is clear that Coed-Darcy has a waste issue that needs to be handled before the building of homes can be established in the area. It is also evident that waste generation from construction sources is significant in Coed Darcy. A substantial amount of construction wastes still predisposed at landfills even though landfill disposal of construction waste materials are still not able to be considered as a sustainable substitute. In actual fact, most of the waste materials that are produced from building construction doings are recyclable in Coed Darcy.

Works Cited

Agyeman, J., & Evans, B. (2004). 'Just sustainability': The emerging discourse of environmental justice in Britain? The Geographical Journal, 170, 155-164.

Apitz, S.E. (2010). Waste or resource? classifying and scoring dredged material management strategies in terms of the waste hierarchy. Journal of Soils and Sediments, 10(8), 1657-1668.

Babin, R., & Nicholson, B. (2011). How green is my outsourcer? Measuring sustainability in global it outsourcing. Strategic Outsourcing: An International Journal, 4(1), 47-66.

Ball, S., & Abou Taleb, M. (2011). Benchmarking waste disposal in the Egyptian hotel industry. Tourism and Hospitality Research, 11(1), 1-18.

Cinquini, L., Passetti, E., Tenucci, a., & Frey, M. (2012). Analyzing intellectual capital information in sustainability reports: Some empirical evidence. Journal of Intellectual Capital, 13(4), 531-561.

Cordeiro, J.J., Sarkis, J., Vazquez-brust, D., Frater, L., & Dijkshoorn, J. (2012). An evaluation of technical efficiency and managerial correlates of solid waste management by welsh SMEs using parametric and non-parametric techniques. The Journal of the Operational Research Society, 63(5), 653-664.

Darby, L., & Jenkins, H. (2006). Applying sustainability indicators to the social enterprise business model: The development and application of an indicator set for Newport waste savers, wales. International Journal of Social Economics, 33(5), 411-431.

Ellison, L., & Brown, P. (2011). Sustainability metrics for commercial real estate assets - establishing a common approach. Journal of European Real Estate Research, 4(2), 113-130.

Ellison, L., & Sayce, S. (2007). Assessing sustainability in the existing commercial property stock. Property Management, 25(3), 287-304.

Kelly, M., Selman, P., & Gilg, a. (2004). Taking sustainability forward: Relating practice to policy in a changing legislative environment. The Town Planning Review, 75(3), 309-335.

Legge, D. (2000). The sustainability of the water industry in a regulated environment. Journal of Environmental Law, 12(1), 3-3.

Paterson, M., & Ward, S. (2011). Roundtable discussion: Applying sustainability legislation to events. Worldwide Hospitality and Tourism Themes, 3(3), 203-209.

Wright, H.A., Ironside, J.E., & Gwynn-Jones, D. (2009). Sustainability in bioscience fieldwork. International Journal of Sustainability in Higher Education, 10(1), 54-67.

Wright, H.A., Ironside, J.E., & Gwynn-Jones, D. (2008). The current state of sustainability in bioscience laboratories. International Journal of Sustainability in Higher Education, 9(3), 282-294.

Wright, T.S.A. (2002). Definitions and frameworks for environmental sustainability in higher education. Higher Education Policy, 15(2), 105-120.

"http://www.environmenttimes.co.uk/images/sce/News/Coed-Darcy-Aerial.jpg" ?

Sources used in this document:
Works Cited

Agyeman, J., & Evans, B. (2004). 'Just sustainability': The emerging discourse of environmental justice in Britain? The Geographical Journal, 170, 155-164.

Apitz, S.E. (2010). Waste or resource? classifying and scoring dredged material management strategies in terms of the waste hierarchy. Journal of Soils and Sediments, 10(8), 1657-1668.

Babin, R., & Nicholson, B. (2011). How green is my outsourcer? Measuring sustainability in global it outsourcing. Strategic Outsourcing: An International Journal, 4(1), 47-66.

Ball, S., & Abou Taleb, M. (2011). Benchmarking waste disposal in the Egyptian hotel industry. Tourism and Hospitality Research, 11(1), 1-18.
"http://www.environmenttimes.co.uk/images/sce/News/Coed-Darcy-Aerial.jpg" ?
Cite this Document:
Copy Bibliography Citation

Related Documents

Energy Consumption for Coed Darcy Site
Words: 2964 Length: 10 Document Type: Research Paper

Coed Darcy The urban village is being constructed on brownfield land that was formerly being used by an oil refinery that was called the Llandarcy Oil Refinery that was owned by BP. This oil refinery was constructed between the years 1918 and 1922 and it has been labeled as the first crude oil refinery in the country. Since there were some economic changes, the site was closed in the year

Urban Drainage System Sustainable Urban
Words: 3018 Length: 10 Document Type: Book Report

If there is an aggregate sub-base, these can provide water quality treatment. There should be good compaction and appropriate geo-textiles especially for areas accessible to heavy vehicles. Permeable pavements reduce the need for deep excavations thereby providing a cost benefit. This system reduces the run-off rates and peak flow. The overall benefit is that it removes pollutants and holds water so that it does enter the main drainage. A lot

Renewable Energy Six Council Properties
Words: 2785 Length: 10 Document Type: Research Paper

Renewable Energy and Interdependencies: Six Council Properties Approach and uncertainty: What is the general approach that you will take to reduce carbon emissions associated with the issue that you are looking at and what sources of uncertainty are likely to be important? The six council properties being constructed by regeneration specialist St. Modwen are situated on a brownfield site that was a former oil refinery and production site used by British Petroleum

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now