Target Corp Project Management Essay

Project Costs
Expanding Target’s online presence will require work on several fronts. First, the company will need to expand the size of its web team, The current team is built mainly to maintain the current website and social media, but this new project is a capital project that requires new incremental investment. The total cost for the needed team is expected to be around $200,000, hired on a contract basis, along with redeployment of existing resources, in order to ensure that the project does not create any problems or issues for the existing web infrastructure. There will also be ongoing needs for two marketers, at a cost of $80,000 per year total. In addition, Target is building some other functionality, including new cybersecurity measures, into this project. The company has already made massive cybersecurity investments in the wake of the 2013 breach. The new cybersecurity investments will be done concurrently with the expansion of the company’s web presence, but they were going to be implemented anyway, and therefore do not count as incremental expenses. The total capital budget will therefore be $300,000, the other $100,000 being for infrastructure, along with ongoing $80,000 needs for operating the website, and redeployment of some existing resources to maintenance of the expanded web presence.

As with most web development projects, there are significant risks associated with timeframes. Because the company is relying on contract labor, the ability of that contract team to deliver on time and on budget is unknown. Target has faith in the project management capabilities of its in-house team, but is also aware that web development projects can have a high level of variance between the expected completion time and the actual completion time. The downside risk of web projects in particular has been fairly well documented – 27% run over budget, with average cost overruns over 200% (Hazrati, 2011).

There are several benefits to operationalizing this idea. The first is that there are opportunities for Target in terms of building a better e-commerce experience. The company lags behind rival Walmart in terms of its e-commerce business, and there have been several things that have been identified as potential causes for that – things that needed to be modernized in the user interface and core site functionality, for example. A reinvented web presence also provides additional opportunity to build content marketing into the company’s overall marketing strategy, and to implement some much-needed improvements to cybersecurity. Being able to tackle these multiple issues is one of the major benefits of this project. This will be weighed against the potential costs, which include the risk of the project going over budget and underperforming in terms of the deliverables.

Work Breakdown Structure

The work for this project will be done in three phases. These are the pre-development, the development and the post-development phases. The pre-development phase will be done by an in-house team that is comprised of members of the marketing and IT teams. The time frame for this stage will be four months, as team members build this project into their daily rhythms. During this phase, the marketing team will work with the IT people to determine the scope of the project. Establishing an appropriate scope and sticking to it is an essential component of bringing a project in on time and budget (Hazrati, 2011). This first phase will also include the building of the team at will work on the site – including back end, front end and UX/UI people.

The marketing team will identify the opportunities that this project can position the company to exploit and set targets for the post-implementation functionality and metrics, in order to determine whether the project was a success or not. By determining up front what the project will achieve, this cross-functional team...…only will an external team be used to build out the project’s infrastructure, but there will be extensive communication required from all participants, and not all of this communication can be face-to-face. Giving each team member the right amount of visibility, and ensuring that communication about any challenges that may arise in the course of the project, will be critical to ensuring its success (Teamwork.com, 2016).

Risk Mitigation

There are a few methods by which the risks inherent in this project can be mitigated. The first is through the use of budgets as a control mechanism. If cost overruns are the biggest risk to Target, then the budget should be subject to considerable scrutiny. Third-party oversight might be required to at least provide visibility from the outside into the budget aspects of the project. It is important that the project is kept on track with a high level of budget control.

There should also be operational control in order to mitigate risk. The project manager will need to have granular visibility into the project to ensure that everything is going smoothly. The means of communication need to be established, and there needs to be clear communication guidelines in place so that everybody knows what their role in the project is. All told, this is significant challenge in terms of risk mitigation – the better the communication, the more likelihood that potential problems are detected early and resolved.

Finally, having clear role definitions is an essential part of risk mitigation. When everybody knows exactly what they are supposed to be doing, the risk associated with the project is lower, because each person can be held accountable for fulfilling their role. Furthermore, the project manager can be held accountable for any roles that needed to be filled but wasn’t. Clear responsibilities, strong communication, and formal budgetary controls are all important elements of risk mitigation for this project.…

Sources used in this document:

References

Hazrati, V. (2011) IT projects: 400% over budget and only 25% of benefits realized. InfoQ.com. Retrieved April 15, 2019 from https://www.infoq.com/news/2011/10/risky-it-projects

Teamwork (2016) 6 obstacles to any project and how to clear them. Teamwork.com. Retrieved April 15, 2019 from https://blog.teamwork.com/6-obstacles-project-clear/


Cite this Document:
Copy Bibliography Citation

Related Documents

Target Corporation Target Organizational Structure Target Corporation...
Words: 911 Length: 3 Document Type: Essay

Target Corporation Target Organizational Structure Target Corporation operates in three major market segments. It operates the U.S. Retail segment, the U.S. credit card segment, and the Canadian credit card segment. In the U.S. Retail segment, consumers can purchase items either online or by locating them in one of its stores. Target operates in the discount general merchandise retail segment. Its credit card segment offers a Target visa, Target card, and branded Target

Project Management AT&T Is a Leader in
Words: 1089 Length: 3 Document Type: Case Study

Project Management AT&T is a leader in communication technology that connects people all over the world. Just as their customers and business depend on them and their services to remain connected, AT&T depends on the internal resources they have particularly project and program managers so that they can remain as the best service providers. Huawei is a Chinese Telecom giant that deals with products such as fixed-line communications, optical transmission, mobile

Project Management in the Oil
Words: 5052 Length: 15 Document Type: Thesis

(Braunschweig; Day, 150) Most of the current generation of project managers expects the project management tools to furnish them with almost real-time knowledge in order to facilitate their decision-making. Some of these tools like DOFF, "Field of the Future," "Smart Fields," Microsoft's "Oilfield Connectivity" and i-Fields are currently being examined by exploration and production oil companies. Some of these tools have the capability of generating information from apparently incongruent data

Project Management - Starting a
Words: 2430 Length: 9 Document Type: Term Paper

PR basically means doing a good thing and speaking about it. In other words, no matter how great the new coffee shop will be, unless it is very well advertised, it will not be worth a dime. The new coffee shop will be advertised on: business cards, T-shirts, travel mugs, coasters, glassware, sport bottles, ceramic cups, and others. Also, the coffee shop could be advertised on radio for greater

Project Management This Report Stipulates
Words: 3294 Length: 11 Document Type: Term Paper

Problems and risks related to contracted a new company relate both to cost, safety measures and legal liability. The primary consideration is cost, as this is the major problem related to the issue mentioned above. The first requirement for the new company would then have to be a cost that is as close as possible to the price to date charged by Walkers Ausgas before the increase. Being a transport

Target Corporation Capital Expenditure Committee in Modern
Words: 2834 Length: 10 Document Type: Essay

Target Corporation Capital Expenditure Committee In modern corporations, various projects compete for the same source of capital allocated for new investments. In preparing an analysis for a Capital Expenditure Committee, the two most important predictive financial metrics used are Net Present Value (NPV) and Internal Rate of Return (IRR). NPV is the present value of the project's cash inflows minus the present value of the project's cash outflows. It indicates the