Project Management Any Project, No Matter What Essay

Project Management Any project, no matter what the outcome is supposed to be, has to be properly managed from outset to completion to make sure that the outcome is the one desired. Without some type of plan, a project can easily become so overburdened with cost and time overruns that it is better just to abandon it and move on. The problem is though that project management often requires a large amount of very complex steps which have to be coordinated in a specific order. To do this the manager has to understand the tools that are at his or her disposal, and they have to understand how to use those tools. The steps required are not inviolate, but it is wise to understand the different phases of project management and make sure that they are all given the proper care. Following is a research paper which looks at the project management process from all possible angles, and discusses the utility of each of these steps.

Manage Scheduling

A project requires certain points that need to be coordinated correctly in order for all of the other pieces to work correctly. Sometimes it may not matter if the schedule is perfected to the nth degree, but most projects require that every tiny detail be ascertained and lined up properly. Also, a project schedule should make sure that the stages are clear for completion of various parts of the project.

Many managers will use different tools to assist them in the detailing of the project schedule because of the complexity of the undertaking (Mind Tools, 2009). One of the major tools that a project manager can use to make sure that everything lines up the way it is supposed to and that everything happens at the right time is a Gantt Chart (Mind Tools, 2009). This chart shows the manager what needs to be done before something else can be done, and helps line everything up correctly. This tool is used to make sure that the most efficient schedule is put forward at the beginning of a project. Besides a network analysis, a scheduler can also conduct a critical path analysis. This entails setting up the steps to be completed according to the "best line" (Mind Tools, 2009) for completing them. It is possible that a schedule may also be compressed to ensure that every step is scheduled with the utmost efficiency in mind. This can be done by either crashing an element or fast-tracking (paralleling) different stages (Mind Tools, 2009).

Supply Management

For a project to survive it is imperative that the workers receive the right supplies in a timely manner. This is one of the most important parts of the planning stage also. If a manager fails in this task then the project is doomed to failure right from the beginning (Henrie, 2006). The supplies must arrive in time, but they must also arrive in the correct sequence. Sometimes they are critical to a stage, but that particular material will not be usable until something else is done. Items such as concrete can only come at certain times in a project. Without the right supply chain timing, it is easy to ruin the chances that the process will succeed.

With management of supplies come some challenges that the manager must be constantly aware of. Henrie (2006) states that "some supply chain risks and challenges include lack of supplier attention, internal procurement challenges, critical material damaged in shipment, and supplier induced changes." The manager must remember that his or her project is not the direct concern of the suppliers. They probably have several people that they are working with at any given time, and they will sometimes lose focus when it comes to a specific project. Although this can mean that they are not called upon in future projects, it may be difficult or impossible to change in the middle of a project. Therefore, it is the job of the project manager to make sure that every supplier stays engaged in the project also. There may also be some difficulty with the orders that were placed for supplies because of too many people being involved on that side. If this is the case, then the manager needs to understand how the supplies are procured and make sure that no obstacles exist in the steady supply. Damaged materials can cause problems because they may be critical to a certain stage of the project, and having the damage repaired or new products procured can delay a project significantly. The manager has to take into account what the critical products are and make allowances...

Suppliers may also find that they are unable to meet the exact specifications required by the project manager. Thus, the manager needs to understand exactly what is needed and what acceptable substitutions would be.
Project Team Recruiting

It is important that the correct team members are selected for a project. Sometimes the manager will not have prior knowledge of the people who will be selected, but he or she needs to understand how the team members will need to be used. Thus, it is necessary that a thorough list of requirements be agreed upon prior to the team selection begins.

Researchers suggest a five step process to hiring team members for a project: "define project roles, search for team candidates, interview the candidates, test the candidates, and select the candidates" (Linman, 2011). The roles have to be set very early in the planning process. The management team needs to understand the distinct jobs they are recruiting for, and what the individual duties will be. The search will sometimes need to be both internal and external. It is possible that every position can be filled within a particular organization, but the possibility exists that outside subcontractors will be required. If this is the case, then the people need to understand the role they are required to fulfill, the project details, and the hierarchy of the project staff (Linman, 2011). Interviewing is relatively self-explanatory, but it mainly entails that the manager knows the roles well enough that he or she can pick the best candidate form among two to five applicants. The next step is not always necessary, but depending on the project, it may be necessary to run some tests to make sure that the people interviewed are actually appropriate on different levels for the project. Selection is easy once this process has been completed because the perfect candidates for the project should be readily apparent to the manager.

Resource Allocation

The project manager has to consider the resources that are available for the project, and what they will need to procure. After the team has been selected there is that resource secured. However, there may be a need to make sure that further team members are available in case someone is unable to perform their duties. Other resources include such items as supplies that will be needed, time and money (Kaiser Family Foundation, 2010). Allocation is the process of determining what resources need to be used when and in what quantities.

This will have to be a part of the original plan that is decided upon. The financial side of the equation is generally decided upon by the manager, the financial team and the heads of the company. The original allocation of money will have to be given prior to the start of the project, but contingencies will have to be made in case there are cost overruns. Time is a resource that is unforgiving, but if it is used wisely can be an ally. The manager will already have made sure that the original plan calls out specific periods of time with completion of certain events occurring within that frame. Time overruns can lead to cost overruns, so the time aspect needs to be handled very carefully. The manager also has to make sure that supplies are properly allocated to the area and part of the team where they are needed.

Time/Cost Tradeoffs

This section basically details which factor of control is the most important to a manager when it comes to finishing a project on time or finishing the project within the proposed budget. The manager must make educated assumptions based in what is known to determine which course is correct. Generally, this is between compressing the schedule and what the compression will cost against the entire cost of the project. The time-cost model makes the assumptions that "the normal cost for an activity is lower than the crash cost, there is a linear relationship between activity time and cost, and the resources are available to shorten the activity" (NetMBA, 2006). The normal cost of the activity will be less because shortening the activity means more manpower and a quicker supply of resources. This means that the decreased time has to make up for the added cost. The linear relationship suggests that as one increases or decreases, there will be an equal and opposite reaction from the other. Finally, the manager must…

Sources used in this document:
References

Chen, S.-J., & Lin, L. (2002). A project task coordination model for team organization in concurrent engineering. Concurrent Engineering: Research & Applications, 10(3), 187-203.

Glen, P. (2003). Monitoring project progress. Retrieved from http://archive.itmanagementnews.com/itmanagementnews-54- 20030429 Monitoring-Project-Progress.html

Henrie, M. (2006). Project management supply-chain challenges. Retrieved from http://www.asapm.org/asapmag/articles/PMSupplyChain.pdf

Kaiser Family Foundation. (2010). Definition: What is resource allocation? Retrieved from http://www.ahc.umn.edu/bioethics/prod/groups/ahc/@pub/@ahc/documents/asse t/ahc_75702.pdf
Linman, D. (2011). Basic tips on project team planning. Retrieved from http://www.mymanagementguide.com/project-team-planning-tips-basic-steps-for- recruiting-project-staff-members/
McMurray, B., & Chamberlin, S. (2008). Post-project value assessments. Retrieved from http://www.maxwideman.com/guests/prioritization/assessments.htm
Mind Tools. (2009). Project schedule development: Planning the timing and sequence of project activities. Retrieved from http://www.mindtools.com/pages/article/newPPM_71.htm
NetMBA. (2006). Time-cost tradeoffs. Retrieved from http://www.netmba.com/operations/project/time-cost/
Sousa, S.D. (2009). Project risk assessment. Retrieved from http://www.my-project- management-expert.com/project-risk-assessment.html
Wallace, S. (2007). Team building, collaboration and communication. Retrieved from http://www.epmbook.com/team.htm
Cite this Document:
Copy Bibliography Citation

Related Documents

Management Problems Dealing With Current
Words: 2860 Length: 10 Document Type: Term Paper

The World Bank model centers on a five-person team called the Performance Advisory Service or PAS (Yandrick 1995). PAS trains supervisors to analyze work performance and personality problems. The supervisor first determines if a skill deficiency is involved or there are personal and environmental factors. He does this by reviewing the employee's records in search of troubled behavioral patterns; consulting with work team leaders, colleagues and support staff in investigating

Management Strategy the Document States the Plan
Words: 1770 Length: 6 Document Type: Capstone Project

Management Strategy The document states the plan of an organization in different phases. For each phase there will be a different management strategy. The document has described the management strategy and the effects that they will have on the performance of the business and why that particular management strategy has been chosen. Management structure needs to be examined carefully when a new business venture is setup. In order to develop and build

Project Management in a Legal Context Project
Words: 1301 Length: 5 Document Type: Essay

Project Management in a Legal Context Project management is increasingly becoming a popular and preferred way of contending with inter-organizational ventures that are out of the ordinary. When the functions of a project require the involvement of specialized personnel and skill sets which may not be readily represented from within the company to the fullest extent demanded, it may be appropriate to organize a project team. This might be comprised of

Management Development Techniques
Words: 2906 Length: 9 Document Type: Term Paper

Management Development Techniques All business organizations seek to maximize the profitability using the least available resources. The bottom-line in realizing such coveted success is by making their management processes efficient. In this regard, managers will often employ various techniques in developing and improving their existing management styles. This is because new issues always would come up and have to be addressed through the necessary change management initiatives. This study will look

Project Management Imagine You Are
Words: 1106 Length: 3 Document Type: Research Paper

Change management is very critical in project management and must be covered in this set of three articles. #2: The rest of the students are not interested in academic careers, however, you feel it is important that they receive a theoretical knowledge of the subject matter. What five essential theoretical lessons would you share with your students that you feel are the most important in assuring professional success as a

Project Management for an Experienced Entrepreneur: The
Words: 2148 Length: 8 Document Type: Essay

Project Management for an Experienced Entrepreneur: The Benefits of Specialized Expertise As an experienced entrepreneur with several successful projects already underway or completed, there is no real need to tell you how important it is to know -- or to consult and work with people who know -- the specifics of a particular process, product, or industry when engaging in a new venture. Knowledge might not translate directly to power in

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now