Controlling Construction Cost: It is seldom that the initial bid estimate to carry out a specific construction activity is the same as the actual cost of doing the work. Generally, the estimate cost tends to be higher or lower due to the various unforeseeable factors that contribute to the differences. Therefore, it is increasingly essential for the project manager and contractor to keep current on the costs of a project through maintaining an accurate and reliable cost control system, especially if a contractor is to make a profit. However, the project manager has an overriding role of providing the project management team with necessary strong and proactive leadership during the construction period. This overriding role and task includes ensuring that the most effective approach to control construction has been adopted and tracking construction activities and costs.

Since the construction phase of a project is usually affected by various external factors that hinder the efficient accomplishment of project objectives, the most effective approach to control construction cost is developing mitigating measures for inhibiting factors....

This is primarily because these inhibiting factors hinder time and cost control during construction projects (Olawale & Sun, 2010, p.509). The development of mitigating measures is based on the understanding of the distinctive challenges associated with controlling construction project costs and schedules. In addition, these measures enable construction managers to be adequately and better prepared and equipped to face and overcome time and control challenges.
The most common inhibiting factors that contribute to challenges in controlling construction project costs include changes in design, risks and uncertainties, complexities in execution, inaccurate evaluation of the time or duration of the project, and non-performance of subcontractors. Mitigating measures deal with these inhibiting factors since they are classified into preventive, predictive, corrective, and organizational initiatives. Preventive measures act as defense against inhibiting factors since they are precautionary measures established to ensure the effective and efficient execution of the project. In contrast, predictive measures are established so as to…

Sources used in this document:
References:

Chartered Institute of Building 2010, Code of practice for project management for construction and development, Wiley-Blackwell, Oxford.

Olawale, Y.A & Sun, M 2010, 'Cost and time control of construction projects: inhibiting factors and mitigating measures in practice,' Construction Management and Economics, vol. 28, no. 5, pp.509-26.
Cite this Document:
Copy Bibliography Citation

Related Documents

Construction Project Risk Management the
Words: 2876 Length: 9 Document Type: Research Paper

Chapman (2001) equated the dangers explained within the Central Computer and Telecommunications Agency Publication "Management of Project Risk" into the design threats that included however were not restricted to "trouble in catching and pointing out the individual requirements," "problem of approximating the time and resources needed to finish the design," "trouble of gauging development throughout the advancement of the design." Chapman likewise specified that the design group's thorough expertise

Construction Project Management the Focus
Words: 2119 Length: 8 Document Type: Research Proposal

(in its turn, the financial environment must be understood with reference to the wider economic situation.) Cost control is the activity which compares cost performance against the cost plan, adjusting one or the other dynamically by reference to the changing circumstances in the project's financial environment. (Hughes, 1991, p.1) 2. Time Control -. Timing is influenced by many environmental factors, but the client's attitude to the timing of the project

Activity-Based Costing Approach to Measure
Words: 5960 Length: 22 Document Type: Term Paper

Many organizations have sufficient control over their cost drivers, specifically those that work with activity-based costing; these companies can locate a sufficient amount of cost information within the company to accomplish these analyses in a timely fashion (Chatzkel, 2003). In reality, though, ABC systems are typically structurally complex and, in spite of the need for complete integration of such ABC systems, many such systems remain as stand-alone analysis tools

Construction Risk Management of Channel
Words: 1856 Length: 7 Document Type: Term Paper

In addition, Sound Transit has installed eight sensing devices for the building, including probes that would register any soil shifting at the tunnel depth. Such alerts would allow Sound Transit time to apply extra grout between the tunnel and the apartment building's basement. 6. Output Analysis and Discussion Here, Sound Transit has taken reasonable and economically feasible precautions to reduce the risk of damage from soil sliding. At this point, the remaining

Construction Project Risk Management Risk
Words: 2900 Length: 9 Document Type: Research Paper

5.4: Accept Bullring team accepted some risks; however, the company developed the effective cost and schedule strategies to manage these risks. For example, the company allotted sufficient fund to militate against risks associated with the project costs and schedule. Table 2 presents the compressive list all the risks deemed to affect the outcome of the Bullring project. Table 2: Associated Risks on the Project Cost Related Risks: Index Scores Tight project schedule 0.67 Design variations 0.49 Project variations from

Activity-Based Costing Cost Accounting Is
Words: 2881 Length: 7 Document Type: Term Paper

General & Administrative-costs cannot reasonably be associated with any particular product or service produced (overhead). These costs would remain the same no matter what output the activity produced. An example would be salaries of personnel in purchasing department, depreciation on equipment, and plant security. In the next step the results of analyzing activities and the gathered organizational inputs and costs are brought together, which produces the total input cost for