The project is focusing on a data collection and analysis for a storage and networking company. It is two years old and has been working to establish a repository. This is unique platform which allows someone to access a variety of information about the organization or individuals. Currently, the firm is utilizing a total of 10 terabytes to store all data. However, this is expected to rise by 20% annually. This is because the firm will have cliental and other stakeholders who will use their systems to store and retrieve more information. (Schultz, 2011) (Smith, 2011)
Describe and define the scope of the project
The scope of the project is to create a working database which is capable of handling the needs of the firm and their cliental. This will be achieved by creating a platform which can be expanded to meet these different goals. These objectives will focus on reaching and going beyond the 10 terabyte platform, utilizing the latest innovations and continuously updating them. When this happens, the firm is more prepared for the challenges it will face and can quickly respond to increasing demand from customers. (Schultz, 2011) (Smith, 2011)
As a result, the scope of the project is to ensure that the platform is capable of evolving and growing with the demands of cliental. This will help everyone to be better prepared for the challenges they will face. At the same time, it will ensure that the organization can achieve its purpose, increase market share / profitability and become a major player inside the sector. Once this occurs, is the point they will meet and can evolve with these changing needs well into the future. (Schultz, 2011) (Smith, 2011)
Speculate as to how to control the scope of the project
To control the scope of the project, there will be a focus on creating solutions that will address these shifting requirements from stakeholders. These objectives will be achieved by looking at the demand (which are 20% yearly increases) and then going beyond these requirements. After this takes place, there will be a focus on steps the firm can take to meet these benchmarks and the possibility of going outside of them. This is because demand could easily exceed these projections and the organization must be ready to make any kind of adjustments in the process. If this kind of focus is taken, the firm will be capable of meeting these demands and going beyond them. This will enable the company to control the project through planning ahead and preparing for any uncertainties in the process. (Schultz, 2011) (Smith, 2011)
Identify possible risks, constraints, and assumptions.
One possible risk is the database could be breached by hackers. These are individuals who will target it because of the large amounts of information it stores. To counteract these issues, the firm must embrace the latest tactics and have third party contractors identify breaches. This prevent them from being able to access any areas which have sensitive materials. (Schultz, 2011) (Smith, 2011)
A possible constraint is the inability to keep up with demand. This is from executives underestimating the need and not preparing for these variables. When this happens, there is the possibility of the bandwidth and size being exceeded. This increases the odds of the system crashing from not taking these perspectives into account. (Schultz, 2011) (Smith, 2011)
As a result, any kind of assumptions must take a realistic perspective and look beyond the current projections. At the same time, there must be flexibility utilized in the process. To achieve these objectives requires have an open attitude and allowing the system to easily expand its capacity. When this happens, the organization is more prepared for the challenges it will face and can evolve with them. This will help to make any kind of assumptions more realistic, by incorporating these ideas together with a certain amount of openness. (Schultz, 2011) (Smith, 2011)
Describe the relationship and integration between systems and infrastructure
The systems and infrastructure will work in conjunction with each other to address the needs of the organization. This is achieved by building a database which is expandable and can address their needs. Data warehousing is when the firm will have the ability to store this information and add to it in the future. (Schultz, 2011) (Smith, 2011)
Analytics will serve as a way of determining capacity, what files are accessed the most and the time involved. This will enable the organization and customers to see which files are accessed frequently and areas on the platform someone visits. Cloud technology will enable the firm and its cliental to store unlimited amounts of data and look at it from anywhere in...
Business Requirements Document Miller Inc. looks forward to creating a data repository for all data collected that is beyond the current relational database it currently uses. The company has currently outgrown the relational database in Oracle that it currently uses. Though it enables data to be stored in different tables that can be linked together using record keys, the amount of keys and records makes it difficult to operate a standard
Where pricing integration typically fails however are in the handling of exceptions. Columbus (2003) makes the point that the use of automated approaches to managing special pricing requests can be one of the highest ROI activities of any company. The focus for LOM then is in turning the one-off loan request specifically including a differing rate or structure into a competitive advantage by quickly being able to fulfill it.
Daily teleconferences with business officers and frequent irregular visits by the same and other business officers will ensure compliance and efficiency standards are being met. Key stakeholders in the factory could eventually include certain business users and clients, and in this event procedures for their own monitoring and inspection of manufacturing processes and conditions can of course be developed and implemented, allowing for a broader range of monitoring goals
Project Management Plan of a New Restaurant This project management plan is majorly concerned primarily with the first two steps which are defining the project; the project objective is broken down into a series of manageable steps called tasks and designing the project process; this work is performed by the project manager and is presented in the GANTT chart where the tasks are displayed in more detail (Hamilton, 2004). Besides, for
Project Management February J. 2014 A project is a temporary group of activity designed to produce unique products and services or results. Typically, a project has a defined beginning and end and therefore having defined scope and resources. (Pierre, 2012). A project also has a specific set of operations to accomplish a singular goal. Examples of projects are as follows: Development of software to improve business process, Construction of bridge or building, Expansion of sales
Project Management Project Information, History, Intent, and Life Cycle Gray and Larson, (2008) define project as "a temporary endeavor undertaken to create a unique product, service, or result." (p 5). Essential feature of a project is that it has a defined beginning and end often subject to time or fund constraint to achieve stakeholder's goals and objectives. Gray and Larson (2008) differentiate between project and program. "A program is a group of
Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.
Get Started Now