Building Surveying assessment; ,
Task 1
a. All documentation for boarding house in Marrickville Council
i. Cost of Works fee cost
ii. Structural Engineer certificate or Party Wall Consent
iii. Plans
Site Plan
Site Analysis Plan
Roof and Floor Plans
Survey Plan
Landscape Plan
Sections and Elevations
Notification Plans
Shadow Diagrams
Storm waterDrainage ConceptPlan
Vehicle Access and Car Parking Plans
Subdivision Plan
Extra Solar Access Prerequisites
iv. Supporting Documentation
BASIX Certificate
Environmental Effects Statement
Arborist Report
Flood Risk Management Report
Water Management Statement
Heritage Impact Statement
Foreshore Risk Management Report
Conservation Management Plan
Waste Management Plan
Structural Engineers Construction Methodology and Report
SEPP65 Developments
Development Standards Exceptions
Fire Safety Schedule
Geotechnical Report
Access Report
RAP in case of Contaminated Land
Acoustic Report
Parking and Traffic Assessment
Social Impact Assessment
3D Model
Photomontage and
Sample and Materials Board Management Plan (Inner west Council N.D.a)
The extant application lacks a few key plans and supporting documentation mandated by the Inner West (Marrickeville) Council for development application. Particularly, it lacks a storm waterDrainage ConceptPlan and the council does not provide its approval for incomplete applications.
b. Compliance with statutory requirements
Affordable Rental Housing or State Environmental Planning Policy (SEPP) 2009 constitutes the key legislation permitting boarding houses. SEPP offers a set of boarding house standards whose compliance may not be utilized for refusing boarding houses (Marrickville Council N.D.a). The 2011 Marrickville Development Control Plans A.2.6 mandates drainage plans in case of boarding houses. The development application in question lacks such a plan, which leads to the conclusion that the application fails to adhere to Marrickville councils development planning statutory requirements.
c. Council documentation requirements compared to legislation
Yes, Marrickville Council has more documentation requirements than what the law requires. The legislature concerned with Marrickville Council development planning includes; the 1993 Development Act, Building Code of Australia, New Zealand/Australian Standards, the 2008 Development Regulation, the 1999 Local Government Act, the 2016 Planning, Development and Infrastructure Act 2016, and the 2016 Local Nuisance and Litter Control Act. For compliance with the above legislature, Marrickville Council outlines additional documents which must be presented for guaranteeing compliance according to regional conditions and circumstances. Local Australian councils possess statutory control over development approval procedures and land-use zoning. Moreover, they are required to formulate and put local and strategic plans into effect (Yigitcanlar 2006). This, thus, makes it mandatory for the council to require additional development planning-related documentation.
d. Council development application checklist
i. Details and Plans to be presented before the council
Survey plan
Context analysis and site report and plan
Scaled plans, sections and elevations
A4 sized elevations and plans
Finish and color schedule
Drainage plan
Landscape plan
Shadow diagrams
Subdivision plan
Sediment and erosion plan
Photo montages and photographs
Waste management and recycling plan
ii. BASIX
ii. Environmental effects statement
iii. SEPP 65 assessment
iv. Minimum lodgment conditions
v. Plan of Management
vi. BCA (Building Code of Australia) compliance report (Marrickville Council, N.D.b)
Task 2: Compliance assessment report
Every external works development application needs to encompass an exterior finish and color schedule, presented as material and colour samples or manufacturer code-bearing trade brochures placed neatly atop a sample board. Materials and colours presented need to be referenced carefully to every planned elevation. The sample boards coloured copies need to be included in the application as well. The existing application lacks a finish and color schedule as...
…to appropriate Environment, Water and Climate Change Departmental guidelines, describing remediation to the areas the development impacts, and validated to ensure all contamination on the site is managed appropriately. Evidence on these matters needs to be put forward before the Councils delegate or the Council itself within a couple of years from the determinations date, failing which the consent lapses (Marrickville Council, N.D.a).b. A deferred commencement for this project
The development consent will be inoperable if the following elements are addressed to the Councils satisfaction: A license of allocation must be acquired for the land, for utilizing site resources as the council did, and as recommended by the councils department. The allocation must be acquired prior to a lapse of 2 years or the consent will expire.
Task 5: Legislative and council requirements for the notification
The minimum development application notification standard is:
Forwarding a notice, in writing, to adjacent lands occupiers and owners, as well as to occupiers and owners of lands right across a road or street. The Council will bank on its own property system during notice compilation for identifying land owners;
Placement of a sign as notice on the land;
Listing the development application within a locally circulated newspaper; and
Adherence to a two-week notification period (which will be extended to three weeks during Christmas and Easter) (Marrickville Council N.D.b).
The council may vary the aforementioned process and permit:
Notifications to properties besides neighboring properties;
Extension of notification period;
Organizing a public meeting
Listing of the application within a locally circulated newspaper;
Exhibition of plans and designs at other open/public places;
Changing the recommendations the written notification contains; and
Consulting with appropriate community…
References
Acoustics Australia, 2017. ACOUSTICS NEWS AND REGULAR ITEMS. Acoustics Australia, 44(2).
Australia, W. 2010, ENVIRONMENTAL PROTECTION AUTHORITY and OFFICE OF THE ENVIRONMENTAL PROTECTION AUTHORITY.
Inner west Council, n.d. Housing and development forms. Retrieved
Marrickville Council, n.db. Guidelines- development application guidelines. Retrieved < http://www.marrickville.nsw.gov.au/Global/marr/marrwr/_assets/main/lib65090/guidelines.pdf > Patterson, M.J., 2004. Recent changes to the sound insulation provisions of the Building code of Australia. Achieve the ultimate with Brüel & Kjær service, 32(3-85), p.111.
Yigitcanlar, T., 2006. Australian local governments’ practice and prospects with online planning. URISA Journal, 18(2), pp.7-17.
Task : reference fileRoofing and cladding � Tiled roofingReferenceSubject matter coveredMonier Roofing. n.d. Installation guide.This is an installation manual that provides technical information on how to install roof tiles. The manual is designed in compliance with both AS 2050 and NZS 4206 guidelines on installing roof tiles. The manual covered the roofing tiles installation process comprehensively from the supporting structure preparation to securing accessories after the tile installation process. In
Building Surveying AssessmentTask 1: Planning Application requirements George Rivers Councila. All documents needed to achieve satisfactory planning-approval submission for a three-storey home and whether or not the venture would acquire council approval.Development Application lodgment requirementsApplication forms (Hard copies accepted)� Complete Development Application� Consent of the owner on a separate letter or formPlans- PDF (All new additions colored)� Survey Plan (needed in case of every new structure and any additions or
Building Surveying assessment_ , 4Task 1: Planning application requirements for Mosman Councila. Documents RequiredIt is always a priority to check the kind of approval needed.Development ExemptA lot of minor changes to buildings such as renovations of the interior and other work touching on non-structural part may fall under the exempt development category. Retention of fences, walls, blinds, awnings, greenhouses, gazebos, sheds, privacy screens, enclosures, pathways, driveways, decks, pathways, internal structures
Building Design Construction Methods and Collapse General building design and construction methods Contemporary building regulations are effective in ensuring the safety of occupants throughout the life cycle of the structure. Government agencies have the responsibility of inspection to ensure safety and enforcing compliance to regulations and codes during constructions. Building design and construction methods evolve in response to emerging trends and demands in the industry. Advancements within the design and construction industries
Building Coalitions Early on in my career I recognized that building coalitions was a highly regarded quality within the federal government, and it became my goal to be respected by both civilian and military leaders. Throughout the course of my career, I have been able to build strong relationships with many outstanding colleagues and have been involved with successful actions at high levels of government which have allowed me ample opportunities
Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.
Get Started Now