Building Information Modeling Strategy For Literature Review

Table 1

Representative Building Information Modeling Implementations in Different Countries

Country

Description

Finland

Approximately 33% of architects and engineers were using BIM applications according to a 2007 survey; no case studies or other surveys of Finnish engineering firms have been conducted to date to the authors' knowledge (Wong, Wong & Nadeem, 2010). The major adopters of BIM include VTT. Building information modeling guidelines are being formulated with industry-wide support and collaboration (Wong et al., 2010).

Norway

The Norwegian Homebuilders' Association has encouraged the adoption of BIM industry wide; the major adopter of BIM at present is SINTEF (Wong et al., 2010).

Denmark

More than a third (35%) of the architectural firms surveyed in 2008 were using Architectural Desktop, followed by Archicad, Revit and Bentley Architecture (Wong et al., 2010).

Sweden

No official mandate for BIM implementation exists and the main drivers are the "Big Three" construction giants; however, there are signs that Traffikverket may be ready to require BIM for infrastructure projects (Around the world with BIM, 2012).

Singapore

This is the only country in Southeast Asia that has implemented BIM to any extent (Wong et al., 2010).

India

An architectural firm that stands out among the crowd by virtue of their progressive outlook and relatively advanced implementation of BIM in a country where most architects are still using AutoCAD and construction is still very much paper-based is InFORM Architects, a 40-member architectural firm in Bangalore. According to a recent article ("A Case Study of BIM Implementation in India"), the company selected Revit, an Autodesk product, as their application of choice with outstanding results: "Its work is critically acclaimed and has won several national design awards as well as design competitions." At present, just over half (55%-60%) of the design projects at InFORM Architects are completed with the Autodesk Revit application. According to the case study, "This includes all the new projects; older ones that are already under construction continue to be on CAD .The firm is committed to expanding this number to over 85% of its projects, so that the majority of its work is done in Revit" (a Case Study of BIM Implementation in India," 2012, p. 3). The case study cites a number of constraints to the implementation of BIM, including:

* Resistance from some staff members concerning the ability of the BIM system to "deliver the goods": The transition from AutoCAD to Revit did face resistance initially -- there was skepticism regarding the ability to deliver smoothly, to address complex design issues, timelines, and the desired quality of output" (a Case Study of BIM Implementation in India," 2012, p. 3).

* in addition, the authors cite a dearth of time available for training on the new Revit systems during a period when the company was busy with other projects using its conventional CAD applications: "Also, the lack of time to update Revit skills while working on projects was a major challenge."

The company overcame these constraints to efficient implementation by investing the resources needed to facilitate the transition, including assigning a full-time architect to the project. According to the case study, "To make the transition easier, InFORM Architects employed a dedicated BIM consultant who was also an architect -- she went about systematically organizing the work flow and, at the same time, helped in the modeling and creation of construction documents for the first 'model' project." Building on the success of this initial project, staff members became sufficiently convinced to use BIM in their own new projects. In this regard, the case study notes that, "Successful implementation of this encouraged the adoption of BIM on other projects. Training sessions to bridge the learning gaps, as well as in-house presentations show-casing the designs done with BIM, helped in motivating entire teams to shift to Revit" (a Case Study of BIM Implementation in India," 2012, p. 4).

United States

DPR Construction operates from 17 offices across the country and the company has deployed BIM applications in all of them to good effect. Although the transition to BIM is not discussed,...

It is also axiomatic that the validation of any strategy will require measuring the effect that an intervention has on the targeted phenomenon. In this case, the validation of the BIM strategy will be based on historic industry performance data, but this data must be interpreted with respect to the constraints to implementation noted above, as well as the time needed for any substantive change initiative to have an effect on organizational performance and the bottom line. There is also the need to factor in the costs of initial as well as the ongoing training that is needed to use BIM systems effectively while "wringing efficiencies out of the learning organization." Finally, it is reasonable to conclude that the state-of-the-art BIM technologies that exist today will be supplanted by even more powerful rendering tools in the future, and the costs associated with training high-paid professionals may be wasted to the extent that new modeling tools are more intuitive while providing even more robust results without the need for training. Despite these constraints and considerations, it is clear that companies that are using BIM today are modeling the way for other construction sector companies that want to achieve a competitive advantage in an increasingly competitive marketplace.
Conclusion

The research showed that one of the most promising three-dimensional rendering tools available to the construction sector today is building information modeling. These applications were shown to be especially useful in helping multidisciplinary design teams collaborate on existing projects as well as providing valuable benchmark and building characteristic data storage that can be used for future projects. The research also showed that these desirable outcomes are especially need during a period when Libya is experiencing a building boom, but a number of obstacles to industry-wide deployment remain in place. Nevertheless, the recent trends in the rate of uptake in other countries indicates that building information modeling represents current industry best practices and companies seeking to gain access to this burgeoning market would be well advised to investigate the suitability of BIM technologies.

References

'a Case Study of BIM Implementation in India.' (2012, August 30). AEC Bytes: Building the Future. [online] available: http://www.aecbytes.com/buildingthefuture/2012/InformArchitects-CaseStudy.html.

'Around the world with BIM.' (2012). AEC Bytes. [online] available: http://aecbytes.com / blog/2012/05/09/around-the-world-with-bim/.

Cotts, D.G., Roper, K.O. & Payant, R.P. (2010). The Facility Management Handbook. New York: American Management Association.

Fisk, R. (2011, February 24). 'Tripoli: A City in the Shadow of Death.' The Independent

(London, England), 1.

Ford, N. (2010, July). "Construction in Africa Success Comes in All Sizes." African Business, vol. 366, pp. 50-52.

Lepatner, B.B., Jacobson, T. & Wright, R.E. (2008). Broken buildings, busted budgets: How to fix America's trillion-dollar construction industry. Chicago: University of Chicago Press.

Libya. (2012). U.S. Government: CIA World Factbook. [online] available: https://www.cia.

gov/library/publications/the-world-factbook/geos/ly.html.

Mailhot, P. (2008, February). 'Break Free from Convention.' ASEE Prism, vol. 17, no. 6, p. 54.

Williams, C. (2009, October). 'Life on the Cutting Edge of Learning: Since Construction Is No

Longer Just a Bricks-and-Mortar Business, DPR Construction's Global Learning Group

Must Be as Agile as Today's Dynamic Market.' T&D, vol. 63, no. 10, pp. 52-55.

Wong, a.K., Wong, F.W. & Nadeem, a. (2011). 'Implementation of Building Information

Modeling in various Countries.' Changing Roles. [online] available: www.changingroles

09.nl/.../Final.KD.Wong-KW.Wong-Nadeem.pdf.

Sources used in this document:
References

'a Case Study of BIM Implementation in India.' (2012, August 30). AEC Bytes: Building the Future. [online] available: http://www.aecbytes.com/buildingthefuture/2012/InformArchitects-CaseStudy.html.

'Around the world with BIM.' (2012). AEC Bytes. [online] available: http://aecbytes.com / blog/2012/05/09/around-the-world-with-bim/.

Cotts, D.G., Roper, K.O. & Payant, R.P. (2010). The Facility Management Handbook. New York: American Management Association.

Fisk, R. (2011, February 24). 'Tripoli: A City in the Shadow of Death.' The Independent
Libya. (2012). U.S. Government: CIA World Factbook. [online] available: https://www.cia.
Cite this Document:
Copy Bibliography Citation

Related Documents

Building Information Modeling BIM
Words: 2082 Length: 6 Document Type: Research Paper

BIM Strategy Developing BIM Implementation Strategy for Libyan Construction Sector Construction, on any project, is a piecemeal affair that often provides so much confusion of parts that it is difficult to ensure that there is not some important element either lost or forgotten. Charles Thomsen, a leading builder, looks inside a construction trailer and sees "a plan rack with separate drawings for architectural, mechanical, plumbing, electrical and civil…special sets of drawings for

Building Information Modeling Implementation Strategy
Words: 2320 Length: 8 Document Type: Literature Review

Since their issue, the International Organization for Standardization has designated IFCs as being the "construction information standard" for BIM applications (Lyon, 2009, p. 40). Because the same types of needs have been identified in other sectors, the need for standardization in the BIM realm was also well recognized. For instance, according to Lyon (2009, p. 40), "Like CAD, BIM will need standardization to share complex information between organizations." According

Managing Building Construction Projects in
Words: 4597 Length: 18 Document Type: Research Paper

Inexcusable delay - these postponements outcome from a contractor's own fault or his subcontractors or substantial dealers Table 3-1 the Most Important Delay Factors According to Contractors Type Delay factor Rank Scheduling Preparation and approval of shop drawings 1 Financing Delays in contractors progress payment by owner 2 Changes Design change by owner during construction 2 Material Delay in the special manufacture out side of Saudi Arabia 4 Financing Owners cash problems during construction 5 Contractual relationship Slowness of owner's decision making process 6 Material Slow delivery of construction material 7 Changes Design errors made by designers 7 Scheduling Waiting for

Information Technologies What Is the
Words: 1450 Length: 5 Document Type: Term Paper

Compare the two managerial roles associated with successfully managed systems projects: the project sponsor and project champion. The project sponsor is typically a senior executive who has the responsibility of accomplishing certain strategic objectives that are so wide in scope they require synchronization of many different parts of the organization. An example would be the development of an entirely new Customer Relationship Management (CRM) system that is capable of reporting back

Building and Managing and E-Learning Infrastructure
Words: 3072 Length: 11 Document Type: Term Paper

Building and Managing and E-Learning Infrastructure E-learning involves training by means of advanced technologies, such as the Internet, Intranet, Extranet, satellite broadcast, audio/video tape, CD-ROM and more (Broadbent, 2002, p. 39). The term e-learning is an umbrella that describes a range of learning situations, including distance learning, web-based learning, virtual classrooms and more. All of these forms use communication technologies as a medium for learning. This paper identifies and analyzes the main

Information Technologies Describe the Three
Words: 1450 Length: 5 Document Type: Term Paper

Further, midrange systems can support a few thousands users, and often have operating systems more focused on distributing resources throughout a network vs. being a computing-intensive system. While there is increasingly a focus in midrange systems to provide both distributive support for networks and computing power, the predominant use of these systems is in synchronizing the many databases a small to mid-size organization up to a few thousand users

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now