Verified Document

Alcan IT Management Systems Analysis Alcan's Growth Essay

Alcan IT Management Systems Analysis Alcan's growth as a global conglomerate in the aluminum and metal fabrication industry follows a similar trajectory of many companies whose business models forced rapid, highly distributed business models at the expense Information Technologies (IT) management systems consistency and performance. Alcan's IT management systems and underlying infrastructure have become balkanized as the company has grown into four separately functioning and highly autonomous business units. In evaluating the key success factors of successful Enterprise Resource Planning (ERP) implementations in multisite locations, the most critical factor overall is creating a unified, well synchronized system of record across all ERP instances (Hanafizadeh, Gholami, Dadbin, Standage, 2010). A second key success factor for multisite ERP implementations is the ability to negotiate a very low level of maintenance pricing with ERP vendors in the form of multisite or use-based pricing instead of the traditional per-seat model (Law, Chen, Wu, 2010). A third key success factor in the implementing multisite ERP systems is the ability to create a shared set of analytics, financial reporting metrics and measured of shared collaboration performance across all sites (Nour, Mouakket, 2011). Alcan has none of these best practices in effect during the time periods of the case study. They are conversely creating very high costs of maintenance for themselves, paying $500M in software costs and fees to SAP, tolerating up to 400 systems dedicated to just pricing alone, and attempting to manage well over 1,000 systems throughout the four divisions. As the company continues to grow and attempts to move into new markets where unifying all four divisions is necessary, they will find their IT systems are more of a liability than an asset in their current configuration. Coupled with the escalating costs of keeping each of the four divisions under maintenance with SAP, the ongoing high costs of integration, there is the threat of compliance violations to industry safety and quality requirements in addition to Sarbanes-Oxley Act (SOX) financial reporting requirements. All of these factors taken together point to the need for more effective IT management strategy that takes into account the critical success factors for ERP system integration in a highly decentralized organizational structure. The intent of this analysis is to evaluate the pros and cons of the current Alcan IT management system, in addition to evaluating the pros and cons of the new Alcan IT enterprise architecture as proposed by Robert Ouelette. The final section of the paper discusses if moving from the current Alcan IT management system to a new structure is advisable or not.

What are the pros and cons of the current Alcan IT management system?

Throughout the case analysis of Alcan, it is apparent that Robert Ouelette is vitally concerned about the performance of procurement and strategic sourcing across each of the four divisions. He is concerned there is massive duplication of effort and this is costing the company significantly both in dollars and lost opportunity cost. The consolidation of ERP instances to gain economies of scale in shared resource areas including supply chain management, sourcing and procurement has consistently shown to also increase quality and performance levels across manufacturing (Seddon, 2009). Quality and cost performance are the arguments for typically consolidating the purchasing, procurement and supply chain functions of a company with a distributed structure. Yet when the advantages or pros of having a highly distributed IT management structure are taken into account for Alcan, this differentiated approach to purchasing and procurement is actually a strength. Each of the Alcan divisions has significantly different sourcing and supply chain requirements, in addition to drastically different phases and speeds of product lifecycles. Given how diverse the product, service and new product development needs are across each of the four divisions, it is defensible to have a separate supply chain and sourcing system for each (Venugopal, Rao, 2011). This strategy of segregating sourcing and supply chain management is most likely the catalyst of the myriad of pricing systems, 400 at last count. It's an advantage to have the separate procurement and supply chain management systems, yet Alcan is paying a heavy price in terms of software maintenance costs and potential economies of scale.

A second key advantage or argument in favor of keeping the existing Alcan IT management system is the ability to more precisely align analytics, metrics and key performance indicators to the specific needs of each business unit. The continual investment in division-specific analytics, key performance indicators (KPIs) and metrics of performance on a divisional basis leads to greater overall tacit and implicit knowledge...

Each business unit or division has constructed and continually improved its analytics, KPIs and metrics to align with their specific sourcing, procurement, production and services functional requirements. This has also created the advantage of greater speed of response and time-to-market as well. The combining of specific analytics and metrics and the ability to increase new product development efficiency on a divisional basis is often one of the most compelling factors in allowing an enterprise-wide IT management system to stay segmented or balkanized over time (Nour, Mouakket, 2011). For Alcan however the many cons or disadvantages associated with such a balkanized IT management system architecture outweigh the benefits, and a change will most definitely need to be made for the company to continually compete effectively.
The disadvantages or cons of keeping the IT management systems separated is the cost, the lack of accuracy and speed of reporting compliance, and the difficulty of integrating process and system integration points across four divisions as the company continues to expand, and lack of synchronization on corporate-wide strategies including new product introductions. The lack of accuracy and speed in reporting is hurting the company's ability to trim back 400 pricing systems that represent a massive duplication of effort. One of the most prevalent signs of an enterprise needing to integrate its many diverse systems is the creation and continual maintenance of systems across divisions that literally do the same task, and which could be slightly modified to support corporate-wide initiatives (Wenrich, Ahmad, 2009). A second disadvantage is how slow Alcan will increasingly become at attaining compliance to both internal quality management standards and Sarbanes-Oxley Act (SOX) compliance as well. This, if taken past the deadlines of the Securities and Exchange (SEC) commission, lead to a fine for the company. Finally the lack of support for interprocess and system integration is also evident in how the company is not solving the very high maintenance fees with any preemptive strategy of system use, in addition to lag times on pricing and performance management statistics at the organizational level (Seddon, 2009).

What are the pros and cons of the new Alcan IT enterprise architecture proposed by Robert Ouelette?

Robert Ouelette's plan has potential to better unify Alcan's operations and make them more cost-effective, efficient and eventually consolidated over time. The reliance on a centralized Web Services architecture will require Service-Oriented Architectures (SOA) be implemented, which will also require significant changes in core areas of purchasing, procurement, supply chain management, accounting and services. In conjunction with the IT plan that is strategic in scope Robert Ouelette has devised, he will also need to create a change management plan that guides education, training and ongoing system development as well (Hanafizadeh, Gholami, Dadbin, Standage, 2010). With these constraints in mind, here is an analysis of the strengths and weaknesses of his proposed strategy.

The pros or advantages of the Web Services strategy is the immediate reduction of a large proportion of the $500M being spent with SAP on maintenance fees and charges, the reduction in a large percentage of the 400 pricing systems that have overlapping functionality, and the better integration of systems and processes for accounting and compliance reporting. Another advantage is the ability to launch highly complex product and services strategies corporate-wide at a much greater pace than is possible today.

The cons or disadvantages include a much higher cost potentially if the professional services and customization of the Web Services and required SOA infrastructure become more complex than initially planned. It is common for large-scale SOA projects that include ERP implementations to cost up to ten times the pricing of the software alone (Nour, Mouakket, 2011). The costs are submerged at the present time of the case study; they are not initially understandable or viewable. Second, there is the disadvantage of completely re-architecting workflows of how each division works with the other, augmenting and accelerating them based on the SOA infrastructure and Web Services. This is often a months-long or even year-based project that also will fuel higher costs (Law, Chen, Wu, 2010). Third, there is the loss of tacit and implicit knowledge that the individualized systems today are capturing and acting on. The capturing of tacit and implicit knowledge is critically important for an organization to continually manage its ERP system to a strong set of metrics and performance guidelines (Seddon, 2009). Finally there is the high cost of change management, both in terms of lost productivity and lost time in getting…

Sources used in this document:
References

Dey, P.K., Clegg, B.T., & Bennett, D.J. (2010). Managing enterprise resource planning projects. Business Process Management Journal, 16(2), 282-296.

Dezdar, S. (2011). Examining ERP implementation success from a project environment perspective. Business Process Management Journal, 17(6), 919-939.

Hanafizadeh, P., Gholami, R., Dadbin, S., & Standage, N. (2010). The core critical success factors in implementation of enterprise resource planning systems. International Journal of Enterprise Information Systems, 6(2), 82.

Law, C.C.H., Chen, C.C., & Wu, B.J.P. (2010). Managing the full ERP life-cycle: Considerations of maintenance and support requirements and IT governance practice as integral elements of the formula for successful ERP adoption. Computers in Industry, 61(3), 297.
Cite this Document:
Copy Bibliography Citation

Related Documents

Alcan IT Management Structure What Are the
Words: 989 Length: 3 Document Type: Essay

Alcan IT Management Structure What are the pros and cons of the current Alcan IT management system? Alcan is perhaps the single most successful global enterprise in the IT industry today. But, despite its success and penetration, it has its own set of pros and cons. Perhaps the biggest negative aspect of Alcan is the level of decentralization in the company. With each sector of the business being an individual unit, with

Importance of the Alcan Case
Words: 5996 Length: 18 Document Type: Capstone Project

Alcan's continued revenue growth is the result of the combined success of increasing sales in four main business units, in addition to growth through acquisition. The cumulative effects of these two factors have served to create a profitable business and one where a highly decentralized organizational structure dominates (Chang, Wang, 2011). The catalyst of the organization becoming so decentralized is the continued revenue gains made across four businesses, each competing

Alcan Case Study Alcan IT Infrastructure Case
Words: 2257 Length: 5 Document Type: Essay

Alcan Case Study Alcan IT Infrastructure Case Analysis The strategic challenges that Alcan is having to overcome in order to continually grow profitably is common across enterprises that have grown through mergers, acquisitions and lack of unified Information Technology (IT) strategic planning. The result is often a balkanized, diverse IT architecture that lacks integration at the system and process level, weakening enterprises from getting to their goals and objectives. Alcan has

Use of Life Cycle Costing Management Technique at Glazer's, Inc.
Words: 4601 Length: 17 Document Type: Research Paper

Management Rationale for the use of life cycle Management at Glazers LCM (Life Cycle Management) is a framework which manages and scrutinises the performance and sustainability of services and goods. This framework aims to achieve the long-term objectives of the business, and gives less stress on the short-term objectives. For getting a more sustainable value chain, organizations are making use of this framework, which would in turn improve their economic and

Financial Analysis Rio Tinto Is a Major
Words: 3654 Length: 13 Document Type: Essay

Financial Analysis Rio Tinto is a major mining company in the FTSE 100, specializing in iron ore. The company is geographically diversified. A close competitor is BHP Billiton, and these two firms are compared on the basis of their operations and financial statements. From a financial perspective, both firms are relatively equal. Both firms had strong years in 2008 and 2010, with a weak year in 2009 in between. Rio Tinto's

Logistics Supply Chain Management Scm :
Words: 4395 Length: 12 Document Type: Term Paper

From the year 1991, environmental considerations have come to be an important standard with regard to Nestle's renovation and innovation of packages and that of the packaging materials. Reduction with regard to the amount of packages and packaging materials which are required for a product and at the same time making conditions for protecting safety and quality is an ongoing important primary objective and priority. Nestle's 'No Waste at Work'

Sign Up for Unlimited Study Help

Our semester plans gives you unlimited, unrestricted access to our entire library of resources —writing tools, guides, example essays, tutorials, class notes, and more.

Get Started Now